What data in Autodesk Construction Cloud could be useful to a buyer
Linked drawing versions, requests for information (RFIs), responses and field evidence could help a buyer test whether an AI assistant can find the right project context and identify missing information. The useful unit is a traceable case; a closed RFI or a folder of current drawings cannot by itself establish what was built.
Start with one question about the project record
This guide focuses on project coordination evidence: which drawing and issue led to a question, what answer was given, and what later evidence supports. A possible buyer task is evaluating an assistant that retrieves the relevant documents and flags an unanswered dependency. That is a proposed use, not evidence of demand for your records or authority to make construction decisions.
Autodesk Construction Cloud is now Autodesk Forma. The former Autodesk Docs is Forma Data Management; Autodesk Build is Forma Build. Older project records may use the former names. The naming change does not establish which tools, subscriptions or permissions your project has.
Sources: Autodesk Forma March 2026 Construction Releases – Built for What’s Next
Keep the links that make a case understandable
Start with a bounded set of RFIs and the material they actually cite. Autodesk documents RFI references to files, sheets, issues, submittals and forms, among other records. An activity log records changes and responses. Their presence in the application does not establish that every linked item will accompany a report.
The following is a proposed inspection map, not a claim that every project retains these materials. Use a project identifier alongside each record ID so similarly numbered RFIs from different projects do not merge.
| Material to inspect | What it contributes | Keep alongside it |
|---|---|---|
| RFI question, responses and activity log | The uncertainty, who responded and when the recorded decision changed | Project and RFI IDs; question; official versus other responses; event times and role meanings |
| Referenced drawing or model version | The design context available when the question was asked | File ID and exact version identifier; drawing revision label; issue/upload dates; relevant view or location |
| Linked issue, photos or markup | The observation that prompted the question | Issue ID; placement/location; dated evidence; relevant comments and reference targets |
| Submittal or change record, where relevant | What product or change was reviewed and its recorded disposition | Record ID; actual submitted revision; response; links to the RFI and approved material |
| Later form or other field evidence | What was checked after the answer | Form/record ID; date; inspected location; recorded result and unresolved exceptions |
Sources: Process RFI
Fictional case: a closed RFI with an unverified condition
All identifiers, dates and events below are invented. They are manifest labels, not Autodesk API field names. In fictional project P-6, issue I-28 concerns a duct route above a corridor ceiling. The exercise is to assess the evidence trail, not give engineering or site-release advice. All times use America/Toronto local time.
| Dated event | Linked evidence to retain | What it establishes |
|---|---|---|
| 6 May, 09:00: conflict recorded | I-28 photo PH-4 and location L-2; drawing F-12 version V3, revision C | The team observed a conflict against the identified design context |
| 6 May, 14:00: clarification requested | RFI R-17 asks whether a revised route is acceptable; references I-28 and F-12/V3 | A specific question was raised before the response |
| 8 May, 11:00: official response | R-17 response A-2 and attachment SK-5: revised route requires a clearance check before covering | The response is conditional; it does not record a passed clearance check |
| 9 May, 16:00: RFI closed | R-17 log entry; revised drawing F-12/V4, revision D, saved separately | The question was administratively closed and a later design version exists |
| 12 May, 10:00: field check | Form Q-9 links I-28, R-17, SK-5 and F-12/V4; result says the checked corridor clearance passed | There is recorded evidence of that limited check, not proof of all installation quality or project completion |
Turn the missing dependency into a test
Give an assistant only the evidence through 9 May and ask: “Does this packet establish that the clearance condition was checked, and what evidence is still needed?” A grounded answer cites A-2, identifies the required check and says its result is unavailable. Treating Closed as proof that the ceiling may be covered would fail this evidence test.
Keep Q-9 out of the input. A reviewer can use it to verify that the later check addresses the earlier condition, but should score the assistant only on what it could know by 9 May. If Q-9 never existed or cannot be recovered, the earlier packet still supports a missing-evidence test; it cannot be labelled an observed successful installation.
For authorized training, a different package could pair historical questions with their documented responses. For internal retrieval, it could help staff locate comparable decisions. Separate those proposed uses and permissions. A project-specific answer should not be presented as a universal construction rule.
A current drawing cannot replace its earlier context
Autodesk’s version-history panel lists file versions and permits version-specific actions. A previous version can be made current, retaining its own version number, so the badge in the files list is not a count of all revisions.
Inspect F-12/V3 and F-12/V4 separately in the fictional case. V4 alone cannot show what the author of R-17 saw on 6 May. Record the file version identifier, drawing revision label and relevant dates separately; do not infer their equivalence from a filename. Preserve timestamps with their time zones, and distinguish the event time from the date a file was uploaded or a report generated.
Recoverability must be checked in the actual project. This guide establishes no universal retention period or promise that deleted records, past attachments or every earlier response can be recovered.
Sources: View Version History
Reports and source files answer different questions
For Files, Autodesk distinguishes source download without markups from Export with selectable markups and issues. The documented export handles PDF, DWG 2D views from files uploaded after May 1, 2023, and RVT 2D views from Revit 2022 onward; output items are PDFs in a ZIP. It is not a native model archive.
The main export page requires View + Download folder permission or above. The version-history page lists some version-menu actions at View only. Have the administrator verify the actual route and permission in your project; these pages do not establish identical behavior for every version or account. Exported links may open the original tool, so a clickable reference does not mean its target is in the package.
For a first RFI packet, open the RFIs tool and the RFI you want, then click Export. Choose the sections to include, such as Activity Log, Comments and References; select Embed References and Embed Official Response Attachments if needed. Click Run Report, then Download report when ready. The single-RFI output is a PDF; all-RFI reports can be PDF or Excel.
RFI embedding accepts only PDFs up to 30 MB, with up to 10 references and 10 official-response attachments; exceeding 10 of a type excludes that type. Compare the report with the original and account for omitted files separately. An Excel list cannot replace a detailed case packet or establish a complete RFI history.
For a readable issue report, choose Export report. Detail PDFs cover the first 500 issues; summary reports cover the first 1,000 in PDF or 10,000 in XLSX. For transfer to a compatible app, Export as BCF produces an issue-exchange file with linked attachments in their original formats, capped at 250 issues. Autodesk sends an email notice if attachments fail to export.
Choose the route for the evidence you need, then reconcile selected issues, output counts and missing attachments. A BCF export does not establish that complete native models or RFI history are included.
Sources: Export Files, View Version History, Export RFIs, Export Issues and Issues Reports
Product access and API coverage need their own check
A project invitation alone does not provide a subscription. Autodesk distinguishes product access granted by the project administrator from the relevant subscription or active trial. Ask which product and tools the account used to collect the records—its extraction identity—can actually use; access to Files does not establish access to all Build records.
For a larger authorized extraction, Autodesk publishes an RFI v3 API (application programming interface), which lets a program request RFI data. It has separate RFI, comment and attachment operations and user/workflow permissions. The actual attachment files use the Data Management API. Have a developer document the exact API version, authorized identity, required setup and retrieved objects before promising coverage. Neither the API announcement nor a report export proves a complete archive of prior states, all linked documents or every project tool. No account, API call or private export was tested for this guide.
Sources: Product Access and Subscriptions, Autodesk Forma Build RFI v3 API is released
An inspection sheet for one permitted packet
Ask the project administrator and records custodian to compare one original RFI with the extracted packet. Maintain a manifest: project ID, record ID, related record ID, file/version ID, event time, extraction time, output filename and missing-item reason. Keep a permitted local copy of required evidence or mark the dependency as access-only.
Use the checks below for the evidence-retrieval task. For this task, a complete retrieval case needs the question, relevant historical file, identifiable response and resolved links. Count later field checks separately from that completeness measure. Count RFIs, linked files and complete cases separately. A fictional result could be: “12 RFIs inspected: seven have the question, relevant historical file, response and resolved links; three lack the original file version; two lack a cited response attachment. Four of the seven also have linked later field checks.” These are example counts, not a buyer threshold.
| Check | Pass evidence | If missing |
|---|---|---|
| Correct context | Question links to the version available at the relevant time | Exclude from historical-context evaluation; consider a current-document task |
| Decision trail | Official response is identifiable; conditions are preserved | Do not substitute an informal comment or Closed status |
| Portable links | Required references resolve to identifiable content in the permitted packet | List access-only or unavailable dependencies |
| Observed result | Dated field evidence addresses the stated condition and location | Label result unknown; keep separate from confirmed checks |
| Coverage | Scope, selection, output counts and omissions reconcile | Narrow the collection description before assessing usefulness |
Resolve project rights before selecting a buyer sample
Autodesk’s General Terms retain the user’s ownership rights in material the user creates and uploads. That does not establish your ownership of a consultant’s design or a subcontractor’s contribution. The terms also address third-party material and responsibility for content rights. Map each proposed item to its creator, contractual custodian and person authorized to approve the specific transfer.
Have the responsible owner review design and model intellectual property, project confidentiality, client and subcontractor agreements, and the proposed training or evaluation licence. Define permitted recipients, purpose, retention and onward sharing. Folder access, project participation and possession of an export do not settle those questions.
Photos, comments and activity logs may expose faces, names, contact details or personnel concerns; drawings may expose sensitive building and access information. Remove unnecessary details while preserving consistent replacement IDs. Distinctive locations and events can still identify a project or person after names are removed.
For organizations subject to Canada’s PIPEDA, the privacy regulator explains that personal information generally stays within the identified purposes unless fresh consent or a legal exception permits another use or disclosure. Have the privacy owner determine the applicable law and authority for the proposed use. Internal construction coordination does not automatically establish permission for external AI training.
Sources: PIPEDA Fair Information Principle 5 – Limiting Use, Disclosure, and Retention, Autodesk General Terms
Prepare a measured description before discussing a licence
Once the internal inspection is permitted, write a content-free description of the product/tools inspected, project and date scope, extraction methods, complete-case counts, available historical versions, later checks and remaining rights gaps. Include incomplete and unresolved cases rather than selecting only neatly closed RFIs.
This guide has not established a buyer program accepting this collection, a price or a ready-made ACC licensing connector. Use the related construction and multi-party rights guides to resolve the specific gaps. A buyer conversation can then concern a defined task and measured evidence coverage, with any sample disclosure separately authorized.
Sources and scope
Source checks support the statements identified below. Product access, contractual rights and suitability for a particular buyer still need to be confirmed for your situation.
- Export Files ↗Autodesk · Checked
Source versus marked-up file output, supported formats and route-specific permissions.
Location: Opening format table; Permission Required; Export options; Access and View Exported Files
Public documentation only; output is not a native all-tool archive.
- Process RFI ↗Autodesk · Checked
RFI references, activity log, official response and administrative closure.
Location: Official Response and Closure; Activity Log; References
UI history is not proof of export coverage or physical work completion.
- View Version History ↗Autodesk · Checked
Current-version badge, version panel and version-menu permissions.
Location: Introduction; Permission Required; Version History Menu Options
Permission table differs from main Export Files page; verify the actual route.
- Export RFIs ↗Autodesk · Checked
Single-RFI export steps, report choices and attachment embedding constraints.
Location: Export a Single RFI; Limits for embedding references; Export All RFIs
Reports are selected representations; compare against source records.
- Export Issues and Issues Reports ↗Autodesk · Checked
Issue reports versus BCF export, original-format attachments, output limits and failed-attachment notices.
Location: Export Multiple or All Issues; Issue Detail Reports; Issue Summary Reports
These report limits do not establish full issue-history retention.
- Product Access and Subscriptions ↗Autodesk · Checked
Product invitation and relevant subscription/trial are separate access requirements.
Location: Opening explanation; access/subscription table
No particular customer entitlement or product configuration was checked.
- Autodesk Forma Build RFI v3 API is released ↗Autodesk · Checked · Source dated Jul 23, 2025
Separate RFI data operations, user/workflow permissions and Data Management attachment storage.
Location: API List; RFI Permission; Attachments
API announcement supports route distinctions; no extraction or current app setup tested.
- PIPEDA Fair Information Principle 5 – Limiting Use, Disclosure, and Retention ↗Office of the Privacy Commissioner of Canada · Checked · Source dated Aug 13, 2020
Purpose limits, fresh consent and exceptions for personal information under PIPEDA.
Location: Your responsibilities
Applicability and any lawful exception require a case-specific assessment.
- Autodesk Forma March 2026 Construction Releases – Built for What’s Next ↗Autodesk · Checked · Source dated Apr 7, 2026
ACC, Docs and Build naming changes under Forma.
Location: Opening product-naming list
Naming is not evidence of access to a particular tool.
- Autodesk General Terms ↗Autodesk · Checked · Source dated Mar 30, 2026
Retained ownership of user-created content, third-party terms and content-rights responsibility.
Location: Sections 5, 8.4 and 8.5
Does not determine rights among project participants or grant a buyer licence.