What data could a parking or EV charging operator license
A parking or EV charging operator could investigate three different collections: occupancy linked to usable capacity, documented pass or rate decisions, and charging sessions linked to equipment and operating history. Each answers a different question. Start by checking one task and its evidence before proposing a licence; neither a busy facility nor a large export establishes an external buyer.
Choose the question before choosing the records
For an owner or operator, the useful starting point is a decision someone needs to make. A planner investigating peak use needs counts and capacity over comparable periods. A reviewer of pass allocation needs the evidence available before the decision, the approval and subsequent observations. A charging analyst needs station and session context. Those are different products, even at the same property.
ParkCo publicly describes occupancy analytics, access and virtual passes, EV charging and payments. This identifies possible source families, not a retained inventory or a complete export route for any customer. This guide is an industry inspection aid; it makes no claim about a particular property or operator’s holdings.
| Collection to investigate | Possible task | Useful unit and essential context |
|---|---|---|
| Parking use over time | Forecast occupied spaces or compare peak periods | Facility or zone × interval; occupied spaces, usable spaces, hours open and missing observations |
| Pass or rate decision histories | Evaluate whether an assistant identifies constraints before recommending a change | One documented decision; earlier rules, evidence, alternatives, approval and observed follow-up |
| EV charging operations | Analyze delivered energy, investigate faults or assess bay turnover | Sessions, kWh, minutes and connector-hours counted separately; equipment status, operating limits and departure evidence where needed |
Sources: The Platform
Find the custodian of each part of the history
A dashboard, a spreadsheet and a maintenance archive may describe different parts of one site. Use the map below to ask who actually holds each part. These are places to investigate, not a list of records every operator has.
For public curb operations, the Open Mobility Foundation’s Curb Data Specification separates regulations, events and calculated metrics. That is a useful reminder to keep rules, observations and summaries distinct. It does not establish that a private garage uses this standard or that municipal records carry a licence for your proposed reuse.
| Where to look | Who to ask | What to verify |
|---|---|---|
| Parking software, sensors and access integrations | Parking administrator and technology provider | Zone/bay IDs, observation method, historical counts, access events, outages and retention; a payment or gate event may cover only some users |
| Pass registers, rate spreadsheets and approval emails | Property manager and policy approver | Effective dates, eligible users, competing uses, rejected proposals and the actual approved change |
| Charging network, station controller and meter integration | Charging administrator, network provider and site energy manager | Session IDs, connector mapping, timestamps, energy units, status/fault history, power limits and what the report omits |
| Drawings, consultant studies and maintenance records | Facilities team, original consultant and maintenance contractor | As-built layout, temporary closures, surveys, work orders, versions and rights to use each contribution |
| Municipal rules, permits and public datasets | Transport/curb team or published dataset custodian | Geographic coverage, effective rules, observation dates and the specific published reuse terms |
Sources: About CDS
Fictional example: one site, three different conclusions
Everything in this example is fictional, including the facility, dates, counts and decisions. It is not a ParkCo field specification or a real client case. Facility F-01 has 100 marked parking spaces, including four charging bays. Ten non-charging spaces are temporarily closed. Keep the charging bays’ own operating records separate from the whole-site parking count.
| Point in the history | Evidence retained | Conclusion supported |
|---|---|---|
| Monday, 10:00: parking observation | 81 occupied spaces; dated layout/closure log shows 90 usable spaces; sensor check covers all 90 | Observed occupancy is 81/90 = 90%. Dividing by 100 would report 81% and hide the closure |
| Monday: request for more passes | 120 active passes, current access rules, hourly occupancy history and a request to add 20 passes | Pass count describes entitlements, not simultaneous arrivals. These records alone do not show that 20 additional vehicles can be accommodated |
| Tuesday: decision | Manager approves a five-pass trial with a review date; ten closed spaces remain excluded | The authorized trial is five passes. It is not approval for the requested 20 or evidence of improved use |
| Following Monday, 10:00: follow-up | 83 occupied of the same 90 usable spaces; event calendar and gaps retained | Observed occupancy is about 92.2%. The difference does not prove the pass trial caused it or that every other period had space |
| Separate charging session, Wednesday | Connected 09:00–12:00; recorded active charging totals 60 minutes and 12 kWh; independent bay observations record arrival at 09:00 and departure at 12:30 | Connection lasted 180 minutes and bay use 210 minutes. Energy delivered, active charging and turnover are different measures |
Turn the evidence into a bounded task
For parking analytics, use occupied and usable spaces for matching intervals, with closures and observation gaps. Keep the current capacity snapshot alongside dated changes; today’s layout cannot reconstruct last month’s available spaces. A forecast should be tested against later observed counts, with the test period kept out of its inputs.
For an AI pass-decision evaluation, provide the fictional records available through Monday and ask: “What needs to be checked before approving the request for 20 additional passes?” Score whether the assistant uses the 90-space denominator, distinguishes passes from concurrent vehicles and asks about peak periods and access restrictions. Withhold Tuesday’s decision and later observations. They describe what happened, not the only correct answer or proof of the decision’s success.
For charging, decide whether the task concerns energy use, charging reliability or parking turnover. Kilowatt-hours (kWh) measure energy; kilowatts (kW) measure power. A connected session can contain idle time. Charging completion or unplugging need not establish when a vehicle left the bay. To measure turnover, count vehicles using each bay over a defined period, with arrival/departure coverage; session duration alone is insufficient. Count available connector-hours separately: one operating connector for one hour is one connector-hour. To investigate faults, link the alert, diagnosis, intervention and subsequent test; a cleared alarm alone does not prove successful charging.
Permitted decision histories might support training; evaluation needs held-out evidence and a scoring rule; internal retrieval helps staff find comparable cases. Operational analytics may need only measured intervals or sessions. These are proposed uses with different preparation and rights requirements, not evidence of a buyer’s demand.
Check the extraction boundary rather than assuming a complete archive
The Open Charge Point Protocol (OCPP) is a communication protocol between charging stations and charging management systems. Its presence does not establish a customer’s archive, retained fields, report access or authority to license records. Ask which protocol/version and integration are actually in use and what the receiving system stores.
As a specific documented example, ChargePoint’s CP4000 operation and maintenance reporting page describes station-owner reports and a Reports → Alarms route with current/historical choices, filters and CSV column selection. That supports investigating an alarm export on that product; it does not prove that session details, maintenance notes, older configurations or parking departures arrive in the same file. No private account or export was tested for this guide.
Have the relevant administrator compare one permitted original interval, decision or session with its proposed extracted version. Check IDs and joins, covered facilities, earliest/latest dates, time zone and UTC offset, units, filters, duplicates, missing end events and retention limits. Preserve local operating periods and clock changes when comparing days. Record missing readings as unknown, not zero occupancy or zero energy.
Sources: Discover our open standards for future-ready EV charging, Reporting
Write an inventory with task-specific coverage
Describe what you checked before requesting a buyer sample. Count facilities, observations, sessions and complete decisions separately. A large sensor-event total can still describe one poorly covered day. For an occupancy table, define an interval’s value: a point reading, average and peak cannot be interchanged.
A fictional inspection might find 80 expected hourly slots across ten eight-hour operating days: 72 have matched occupancy and usable-capacity evidence, and eight have sensor gaps. It might also find six pass decisions, four with linked earlier evidence, approval and follow-up, plus 20 charging sessions, 15 with linked bay departure evidence and five without. These are illustrative inventory counts, not minimum volumes or proof of representative coverage.
| Inventory field | What to record | Decision it enables |
|---|---|---|
| Boundary | Facilities/zones, covered dates, hours open, extraction date and selection rule | Know which locations and periods the collection represents |
| Measurement | Observation method, interval definition, kWh/kW/minutes, time zone and changing capacity/configuration | Decide which values can be compared or combined |
| Completeness | Expected versus usable intervals; sessions versus attempts/failures; complete versus unresolved decision cases | Choose the task supported by the evidence and report exclusions |
| Links and outcomes | IDs connecting observations to rules, sessions to equipment, decisions to approvals and follow-up | Distinguish a joined history from disconnected totals |
| Coverage limits | Excluded users, offline periods, seasonal/event mix, failed cases and missing outcomes | Avoid representing a selected period or successful-session sample as the whole operation |
| Custody and handling | System owner, source contract, sensitive fields, permitted recipients/uses and unresolved authority | Decide what can be described or shared and who must resolve each gap |
Separate custody from permission to license
The property owner, parking manager, software provider, charging network, tenant, consultant and payment processor can hold different pieces of the same history. Ask the responsible owner to document which agreements and obligations apply to each proposed collection. Payment processing access or an administrator’s export permission does not settle onward licensing of customer records or third-party material.
Prefer the least identifying fields that answer the task. Occupancy planning may need interval counts and capacity, not plates, faces, account names or payment credentials. Pass cases may expose employee routines or tenant terms. Charging histories can reveal repeated visits. Use consistent replacement IDs only where links are needed, and assess whether time, location and distinctive patterns can still identify someone.
Canada’s privacy regulator warned, in its 2022 Tim Hortons location-tracking findings, that de-identified geolocation could be re-identified and that service-provider use needed contractual safeguards. That is a concrete location-risk example, not a ruling that every parking aggregate is unlawful or a current legal clearance for a new use. Have the appropriate privacy/contracts owner assess the collection and intended jurisdiction.
Before any sample disclosure, record the permitted purpose, recipient, retention and onward-sharing limits, including whether AI training or evaluation is covered. An internal operational use does not automatically authorize an external model-training use. Keep unresolved material out of the sample rather than treating a removed name as sufficient protection.
Sources: Tim Hortons app violated privacy laws in collection of vast amounts of sensitive location data
Test usefulness and buyer fit with a description first
No parking- or charging-specific acquiring program is verified here. A planning organization, analytics team or model developer is a possible user category, not an identified customer. Internal savings or a successful operating decision do not establish willingness to pay for a licence.
Use the inventory to describe a narrow task, coverage, quality limits and proposed rights without sending customer records. A possible partner’s next useful response is a requirement: which geography, time span, measurement frequency, missingness limit and permitted use would matter? Compare that requirement with the checked collection before investing in a wider extraction. The related guides below cover ParkCo source checks, pass decisions, charging operations and multi-party/location issues in more detail.
Run one joint inspection and choose the next action
Bring the property/operations owner and the relevant system administrator together for one permitted internal inspection. For parking, reconstruct a period with its usable capacity and a dated pass/rate decision. For charging, reconstruct one session and, if turnover or repair is the task, its departure or maintenance evidence. Have the privacy/contracts owner identify what the proposed use would require.
If the required history joins correctly and authority is documented, extend the inspection across a bounded mix of ordinary, busy, failed and missing-data periods and finish the inventory. If it does not, name the missing record and its custodian: recover it, narrow the task, or stop that collection. The immediate result is a defensible description of available evidence and an owned next action, before a licensing sample or price discussion.
Sources and scope
Source checks support the statements identified below. Product access, contractual rights and suitability for a particular buyer still need to be confirmed for your situation.
- The Platform ↗ParkCo · Checked
ParkCo advertises occupancy analytics, access/virtual passes, EV charging and payments as source families.
Location: Platform product navigation; InsightDashboard and InsightDetect descriptions
Vendor public descriptions only; no customer inventory, export procedure, retention or performance independently verified.
- About CDS ↗Open Mobility Foundation · Checked
CDS distinguishes public curb regulations, events and metrics including occupancy and dwell time.
Location: How CDS works: Curbs API, Events API and Metrics API
Public-curb specification; not evidence that a private facility implements it or has permission to redistribute observations.
- Discover our open standards for future-ready EV charging ↗Open Charge Alliance · Checked
OCPP is communication between charging stations and charging management systems; protocol versions differ.
Location: Opening OCPP description and version overview
No customer-facing export, retained archive or commercial rights demonstrated.
- Reporting ↗ChargePoint · Checked
CP4000 reporting documentation describes station-owner reports and alarm selection/filtering/CSV export.
Location: CP4000 Operation and Maintenance Guide: Generate a Report; To find alerts in the ChargePoint Platform, steps 1–6
Product-specific public documentation; no account tested and no complete session/maintenance/departure archive established.
- Tim Hortons app violated privacy laws in collection of vast amounts of sensitive location data ↗Office of the Privacy Commissioner of Canada · Checked · Source dated Jun 1, 2022
The Canadian joint investigation highlighted re-identification risk in de-identified geolocation and service-provider contractual safeguards.
Location: Paragraphs on third-party supplier terms, re-identification risk and contractual safeguards
Dated case-specific Canadian enforcement example, not universal legal advice or clearance for a proposed parking dataset.