Foundations

How do I receive, integrate and maintain purchased data

Receive purchased data into a controlled review area, check it against the agreed delivery and intended task, then approve a specific version for use. Decide how updates replace or change existing records before automating imports. Keep recovery and exit plans within the licence’s retention rules.

Agree what a delivery actually contains

For a buyer, the first decision is whether the delivery can support the job you purchased it for. A successful download answers only whether something arrived. It does not establish that the records are complete, current enough, correctly understood or permitted for your use. Ask the supplier to identify each release and give your internal data owner responsibility for accepting it.

Use a handover sheet tied to the order or licence. Record the release ID, covered dates, delivery time, files or access location, schema version and responsible supplier contact. A schema describes the fields, types and allowed values. Add the expected record counts, stable record IDs, units, time zones, missing-value meanings and known gaps. Keep access credentials in your approved secret store rather than in that sheet.

Specify whether each update is a complete replacement, new records only, or a set of additions, corrections and deletions. A current snapshot does not automatically contain the history of earlier values. Ask for that history separately if your task requires it.

Choose the access method you can operate

The following comparison is a set of questions for your supplier and technical owner, not a promise that a particular service offers these features. Choose for repeatable use and recoverability, as well as convenience.

MethodWhat to establish before acceptanceOperating consequence
Versioned filesFile list, format, schema, counts, checksum algorithm/value and whether each delivery replaces the lastYou control the import schedule; arrange storage, permitted retention and correction handling.
API accessHow to retrieve all pages, identify a consistent release, resume after interruption, detect corrections/deletions and work within agreed limitsAn API response is one retrieval result. Record what was fetched and test whether repeated or interrupted retrieval misses or duplicates records.
Managed database shareWhich tables/views you may query, how a version can be identified, when contents change and whether export or local copies are allowedTest queries and access loss. Do not assume you can keep a frozen copy or restore an earlier view.

Check the package before checking its meaning

For files, compare the received list and counts with the handover. Recompute the stated checksum, a value calculated from file contents, using the agreed algorithm and compare it with the supplier’s value. Obtain the expected value through a trusted supplier channel; a file and a checksum changed together are not independent assurance.

W3C’s DCAT 3 vocabulary describes downloadable forms of a dataset, checksums and relationships between versions. Those concepts can help structure a handover, but adopting DCAT is not required for this checklist. A matching checksum supports file integrity; it does not establish correct labels, completeness, lawful supply or fitness for your task.

Sources: Data Catalog Vocabulary (DCAT) - Version 3

Make the acceptance decision visible

Load into a review area with access limited to the permitted reviewers. Keep the active workflow unchanged until a named person accepts the candidate release. Agree task-specific tolerances before the purchase or trial: a high average quality score should not conceal a missing field essential to your use.

For tabular data, check that record IDs are unique where required and that references between tables lead to existing records. W3C’s CSV on the Web primer explains how metadata can express types, required values, unique keys and links between tables; a CSV file alone does not declare those rules. You can use an ordinary validation report if a formal metadata format is unnecessary.

Use this decision sheet for the first delivery and material changes. Record the expected result, actual result, defect owner and acceptance decision for each row. The checks below are proposed operating controls; set the thresholds for your actual task.

CheckEvidence to recordDecision if it fails
Scope and timelinessExpected versus received files, records, date coverage and latest event time; note the delivery time separatelyHold missing or stale material; ask the supplier for a correction or an explicit revised scope.
Structure and meaningField/type checks, unique IDs, working joins, allowed values, units and time zonesHold affected imports until the mapping or supplier documentation is corrected.
Task rehearsalRun the candidate through a representative report, retrieval query or evaluation; compare with known examplesInvestigate changed answers. Do not accept just because the loader ran.
Retry and recoveryRepeat the same update in the review area; check counts and results stay as expected; rehearse restoration where permittedRepair duplication or recovery failures before scheduling the import.
Authority and handlingConfirm the delivery, users, purpose, storage and retention match the agreed termsRefer a mismatch to the responsible commercial/privacy owner before use.

Sources: CSV on the Web: A Primer

Fictional example: 40 changes are not 40 new cases

This entire example is fictional, including the counts, labels and release names. A buyer licenses service-case status data to show workload by current status. Release R1 contains 200 distinct case IDs. The next delivery, R2, contains 40 changes: 35 new cases and corrections to five existing cases. Three of the new cases use a new status, awaiting_customer; the other 32 use the already understood status, closed.

The intended result is 235 distinct cases, with the five corrections applied to their existing IDs. It is not 240 cases. If the same batch arrives again, it should still produce 235. This rule follows the fictional update agreement; another supplier might deliver full snapshots or event records that require different handling.

Observation in the review areaReasoningAction before release
A simple append produces 240 rowsFive rows describe changes to existing cases rather than new casesMatch on the stable case ID and apply the agreed replacement rules; confirm 235 unique IDs.
The importer defaults awaiting_customer to closedA newly introduced meaning is being lost even if the row counts look correctKeep the three cases explicit and hold the affected dashboard refresh until the supplier confirms the meaning and the owner approves its display.
A retry changes totals againReceiving the same update twice is changing the resultFix the import so it recognizes the release/change identity, then repeat the rehearsal.
R2 integration is acceptedCounts, meaning and representative dashboard results now match the agreed checksRecord R2, mapping version and approver; only then refresh the active dashboard.

Record which version produced each result

Suppose the fictional supplier confirms that awaiting_customer means waiting for customer input. The owner approves a separate waiting category for the three cases. Even closed is only the supplier’s recorded status: it does not prove the underlying problem was solved. The buyer must confirm that the status definitions suit the workload question.

Keep a run record linking the supplier release, your field mapping and transformations to the resulting report or other output. For R2, that includes the corrected-case handling and the approved treatment of awaiting_customer. If the supplier later corrects a date range, this record helps identify which reports need review rather than rerunning everything blindly.

W3C’s PROV family describes the data, activities and people involved in producing a result. A short run record can apply that idea without implementing the full standard. The record documents a chain of work; it does not certify ownership or prove that every transformation was correct.

Sources: PROV-Overview

Maintain freshness, corrections and support

Name both an operating owner and a supplier escalation contact. Monitor the latest covered event time as well as when the delivery arrived: a file received today can still contain last month’s records. Agree how late a delivery may be before the report is marked stale, held or shown with a warning.

Ask the supplier how it announces field removals, renamed fields and new status meanings; how much notice you receive; and whether a test release is available. A change can preserve the same column names yet alter units or definitions. Compare content and task results, not just the file layout.

Agree a correction process: which release is affected, whether the supplier replaces it or sends changes, how you receive deletion instructions, and who decides which downstream outputs need repair. Keep defects, supplier replies and your acceptance decision together. Support response times and fixes are matters to agree with the supplier, not guarantees supplied by this guide.

Plan renewal, loss of access and migration

Before renewal, compare the actual covered periods, useful records, defects and maintenance work with what you expected. Check the new price, scope and terms rather than allowing an unchanged connection to stand in for a renewal review.

Before the arrangement ends, establish what happens to API credentials, shared access, local copies, backups and derived outputs. Confirm any notice, retention or deletion duties with the responsible owner under the applicable terms and obligations. Being technically able to keep an export does not establish permission to use it after termination.

Keep a previous accepted release for rollback only where retention and use remain permitted. If a correction or deletion makes that release unsuitable or impermissible, restoration is not a safe default: pause the affected use and agree a compliant recovery route. For migration, preserve the permitted schema, mappings and run records, then test the replacement against the same task before switching. A different supplier’s similarly named field may mean something different.

Start with one delivery and one real use

Ask your data owner and technical operator to complete the handover sheet for one permitted delivery. Run the decision sheet against one representative task and rehearse a repeat import. Have the commercial owner resolve handling and exit terms that the technical checks cannot answer.

Finish with a short receipt: “Release received; checks performed; defects outstanding; accepted, held or accepted only for a specified limited use; approver and date.” Link the tested mapping and resulting output. That gives the next operator something concrete to maintain, rather than an unexplained folder or a working connection nobody owns.

Sources and scope

Source checks support the statements identified below. Product access, contractual rights and suitability for a particular buyer still need to be confirmed for your situation.

  1. Data Catalog Vocabulary (DCAT) - Version 3 ↗W3C · Checked · Source dated Aug 22, 2024

    Distributions, checksum integrity and dataset-version relationships; checksum reference must be independently trustworthy.

    Location: 6.8 Class: Distribution; 6.8.20 checksum; 6.17 Class: Checksum; 11 Versioning; 17 Security and Privacy Considerations

    Metadata vocabulary, not a purchase contract, authenticity guarantee, quality certification or mandatory implementation.

  2. PROV-Overview ↗W3C · Checked · Source dated Apr 30, 2013

    Provenance concerns entities, activities and people involved in producing data; provides a model for exchanging that information.

    Location: Abstract; 1 Introduction; 2 Document Roadmap

    Non-normative overview. A provenance record does not establish lawful ownership or certify factual accuracy.

  3. CSV on the Web: A Primer ↗W3C · Checked

    Metadata can express column types, required values, unique keys and references between tables that CSV alone does not declare.

    Location: Abstract; 3.10.2 Using a separate CSV file to give a list of valid values; 3.13 required values; 3.14 unique values; foreignKeys example 36

    Non-normative primer; no supplier export, validation tool or private account was tested. Publication date not established from the retrieved page.